205th Engineering and Installation Squadron helps complete $22 m

Staff Sgt. Tyler Evans, a 205th Engineering and Installation Squadron (205th EIS) cable installations Airman, feeds cable as he creates a telecommunications connection point in the main distribution frame, where communications from outside the building are routed and connected to internal networks, July 24, 2018, during a hangar renovation project at Buckley Air Force Base in Aurora, Colorado. The 205th EIS team, from Will Rogers Air National Guard Base in Oklahoma City, completed more than 1,000 cable drops and installed an estimated 200,000 feet of indoor cable as part of the 6-week install for the renovation, which was estimated to be a $22 million project in total. (U.S. Air National Guard photo by Staff Sgt. Brigette Waltermire)

PHOTO BY: Staff Sgt. Brigette Waltermire
VIRIN: 180724-Z-AP992-010.JPG
FULL SIZE: 1.55 MB
Additional Details

No camera details available.

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.